Get in touch

Fixed-price offer

A three-hour export brought down to 40–60 minutes.

Measured in production, on a national public-sector application. If a job is blocking your nightly window, that is the kind of problem I take on at a fixed price.

Who this offer is for

Teams living with a job nobody dares touch. The symptoms are always the same: a nightly batch overrunning its window, an import that fails near the end and has to be restarted from scratch, a queue falling behind every Monday. Everyone knows it is a problem; nobody has three weeks to spend on it.

This is not a consulting engagement. There is code at the end, and a measurement.

Three formats

  • 2 days · remote

    Diagnostic

    I measure before concluding. Profiling the job, reading the code and the data model, analysing execution plans.

    • Written report, ten to fifteen pages
    • Root causes ranked by gain against effort
    • Achievable gain estimate, with its margin of error
    • One-hour walkthrough with your team
  • 5 to 10 days · fixed price

    Intervention

    The diagnostic, then the fix. A measurable target is written into the contract before work starts, together with what happens if it is missed.

    • Written, measurable performance target
    • Fix delivered in your repository, with tests
    • Before and after measured on your environment
    • Knowledge transfer to your team
  • 5 days · fixed price

    Delivery pipeline

    When the problem is not the code but how long it takes to reach production. Containerisation, continuous integration, deployment.

    • Working GitLab CI or Jenkins pipeline
    • Reproducible Helm or Kustomize deployment
    • Automated staging environment
    • Documentation and handover

Result commitment

The terms, in writing, rather than a sales promise.

  • The target is set after the diagnostic, never before. Nobody can promise a gain on code they have not read.
  • It is written in measurable form: an execution time, on a given volume, on a given environment.
  • Measurement happens on your environment, not on my machine or on a reduced test set.
  • If the target is missed, the remedy agreed in the contract applies. If the cause lies outside the agreed scope, it does not, and that limit is written down too.

Technical scope

  • High-volume batch Spring Batch, Java jobs, large imports and exports, data migrations.
  • Databases PostgreSQL, Oracle, MySQL. Execution plans, indexes, data model, set-based access rather than row by row.
  • Streams and search Kafka, Elasticsearch, ActiveMQ. Lagging queues, slow indexing, feed pipelines.
  • APIs and services Spring Boot, microservices. Response times, cascading calls, contention.
  • Production Kubernetes, OpenShift. Sizing, memory limits, restarts, queues.

Out of scope

  • Emergencies during an incident. A diagnostic means measuring calmly, which is not possible during an outage.
  • Technologies I do not practise. If the problem sits in .NET or PHP, you will know on the first call, not on day five.
  • Engagements where a representative environment is not available. Without measurement there is no diagnostic, only opinions.

First call

Thirty minutes on a call. You describe the job, its volume, its execution window and how long the situation has been going on. You leave with a view on how likely a gain is, or with the information that the problem lies elsewhere. The call is free and sometimes ends with no engagement to sell.